Start over. Start late. Start slow. Start again. Just start.
Sun Devil Wind was founded in the Fall of 2026 by ASU engineering undergraduates who noticed that wind energy related opportunities at ASU were quite scarce. Sun Devil Wind was formed with the goal of increasing campus interest in wind energy technologies.
Neither founder had built a wind turbine. Neither had worked on one. That turned out to be the normal starting condition — nearly every team in this competition is made of undergraduates learning the machine as they build it, which is the entire point of the exercise.
The team welcomes any ASU student, from any major, with the curiosity to develop new renewable technologies and a passion for solving modern environmental challenges.
Learning is the deliverable. A student team’s real output is not the turbine. It is a group of engineers who have taken a machine from a blank sheet to a wind tunnel, made the wrong call several times, and know why. The wind turbine is the evidence.
CWC+ is a year-long project with a fixed end date, which makes it unlike most coursework. There is no partial credit for a turbine that is nearly finished in May. The schedule works backwards from competition, and every team has to hit its dates or the ones after it slip.
The work is deliberately hands-on. Members are in CAD, on machines, with a soldering iron, running tunnel tests, and reading wind resource data — not watching someone else do it. For most people on a first-year team, this is the first engineering project they have owned end to end.
Registering as a recognized student organization through Sun Devil Central, securing a faculty advisor in the Ira A. Fulton Schools of Engineering, recruiting the first cohort of members, and learning. This is the part you would be joining.
Submit the team’s application for the 2026–27 cycle and stand up the three teams: technical, project development, and outreach.
First prototype, first tunnel tests, first components. The wind farm development plan runs in parallel with the hardware.
The turbine goes into the tunnel in front of industry judges in San Luis Obispo, and the development plan gets defended out loud.
This page stays honest as it grows. When a blade design fails, it goes here. When the first tunnel test produces a number we did not expect, that goes here too. Teams that only publish their wins are not useful to the students who come after them, and the failures are where the engineering actually happened.
Your gift buys materials, machine time, and tunnel hours for the first wind turbine ASU has built.
Sun Devil Wind is a student organization at Arizona State University. Ask us about tax-deductible giving through an ASU account.